Our Projects

See what we have done

Working at night at the side of a busy motorway engineers from Pile Analysis safely and efficiently confirmed the suitability of steel H-piles installed to support new vehicle management signs.

Dynamic Load Testing was carried out at the side of the M6 during harsh weather conditions of winter 2009/10.

Four steel H-piles were tested and capacities confirmed in just over two hours of testing allowing the piling contractor to demobilise and clear the site before the morning rush hour traffic. The use of wireless technology aided safety on this site by eliminating the trip hazard of trailing cables at night.