Pile Analysis carried out testing to steel tubular and sheet piles installed at Milton Creek where the new road will cross the creek.

The piling forms the temporary works required to allow a large diameter bored piling rig access to the creek to install the permanent piles for the marine bridge piers. Testing was carried out at both the northern and southern access works.

Pile Analysis use of wireless technology to connect the instrumentation to the pile driving analyser was essential in this temporary works environment.